• 2014 China 60Hz 440V 20kva clip on generator set for reefer container

2014 China 60Hz 440V 20kva clip on generator set for reefer container

20kva clip on generator set for reefer container
1.Yanmar engine+Marathon alternator
2.16kw,60Hz,1800rpm
3.CE certificate
4.Manufacturer in China
 

Product Details

Quick Details Parameter

Engine : Yanmar
Alternator : Leroy somer
Control panel : manual control panel
Fuel : diesel
Warranty : 6month or 500hours
Package : plastic wrapping or plywood case

Description

Product Description

Clip-on diesel generator is designed for mounting to the upper front structure of an ISO reefer container. The design incorporates quick connections to the upper container corner castings. Additional attaching points on the container vertical structural members provide a secure mounting arrangement.  

 

Genset Model

PFY16GFBL

GENSET

Rated power(Kw/kva)

16/20

Frequency(Hz)

60

Pahse

3

Voltage(V)

460 or 440

Fuel capacity(L)

200

Fuel consumption(L/Hour)

4.8

Dimension (mm)

L

2310

W

660

H

1100

Weight(kg)

750

 

 

ENGINE

Model

4TNV88-GGE

Max. output (kw)

23.7

Cylinders

4

Bore×stroke(mm)

88×90

Type

Vertical,4-cycle water-cooled diesel engine

Starting method

Starting motor 12V,1.4kw

ALTERNATOR

Model

GM-16-4

Manufacturer

Marathon

Insulation class

H

Excitation method

Brushless self-excitation

 

Installation:

 

1.Install clamp handle and slotted spring pin. refer to the picture 01 and 02 ,before the clip-on generator set is used for the first time.

Caution: the mounting clip-on the head of the clamp shaft must be horizontal and outward , the clamp handle must be vertical and downward.

 


 

2. Lift the lock block and turn the clamp handle to rotate the clamp shaft 90 degree (the

 

mounting clip is vertical ). refer to the picture 03

Release the lock block to hold the clamp handle. refer to the picture 04


 

3.Lift the generator set into mounting position on front wall of the container. Foot of generator set mounting clamp should fit into mounting hole on each side of the container. refer to the picture 05,06

Caution: take adequate precautions when lifting and mounting the generator set to prevent personal injury or unit damage.

 

4.When the Foot of generator set mounting clamp fully inserted into the container mounting hole, lift the lock block and return the clamp handle to rotate the clamp shaft 90 degree(the mounting clip is horizontal). Release the lock block to hold the clamp handle. refer to the picture 07,08

Caution: watch the mounting clip on the head of the clamp shaft when rotating the clamp handle. The mounting clip must be horizontal. Rotating the clamp handle is easy by loosening the locknut on the clamp shaft.


5.Check to the mounting clip should pull the generator set frame tight against the container front wall. The mounting clip mustbe tightened by turning the locknut on the clamp shaft. refer to the picture 09,10,11

 

 

 

 

6.Install the lower mounting bolts

a)Remove the retaining pin from the lower mounting bracket.

b)Remove the mounting blot and backup plate from the keeper nut. Put the mounting bolt through the backup plate and install the bolt in the mounting screw hole of container.

c)Tighten the lower mounting bolts

d)Install the retaining pin and hair pin key to prevent accidental loss of the   mounting blot and backup plate during unit operation

refer to the picture 12

  

Packaging & Shipping

Package: plastic wraping

Delivery time: 30 working days after receiving the deposit.  

 
Our Services

We provide guarantee for 500 running hours or 6 months for range from  the min to 50kW  (including 50kW) genset; 1000 running hours or 12 months for range from 50kW to the max genset (whichever comes first). Warranty doesn' t cover spares such as filters, V-belt, etc. Malfunctions caused by misoperation and careless maintenance will not be considered by us.

 
Company Information

   After over a decade's developing, Dalian Puyang International Trade Co., Ltd. has become the leading generating set manufacture in Northern China. We have the largest scale of production and full product specifications and models. Puyang diesel generating set has past the test of China National Internal Combustion Set Quality Test Centre, we have also got the telecommunication facilities network import license of National Telecommunication Department and marine product certification of PRC, and we have been authorized by ISO9001 and WSSN2000 as well.

 have got long-term cooperation partners such as CUMMINS, MAN, VOLVO, DAEWOO, MITSUBISHI, SHANGCHAI (DONGFENG), WUXI POWER (WANDI), WEICHAI (TONGXIN), SINO-AMERICAN JOINT VENTURE SHANGHAI MARATHON, and BRITISH OWNED ENGGA

 

Company Profile

Dalian Puyang Generating Set Co., Ltd.

Dalian Puyang Generating Set Co., Ltd.

 

Post Buying Request

  • * Title:Please input title
  • * Message:Please input message
  • Your message must be between 20-8000 characters
  • * Your Email Address:Please input Email
  • Your email is also your login ID